Blogroll
- ASPO The official site of the Association for the Study of Peak Oil & Gas.
- Energy Bulletin Clearing house for news regarding the peak in global energy supply.
- PowerSwitch Dedicated to raising awareness & discussion of the impending & permanent decline of cheap oil & gas supply.
- ODAC Oil Depletion Analysis Centre working to raise awareness and promote better understanding of the world's oil-depletion problem.
- Global Public Media Public service broadcasting for a post carbon world.
- Post Carbon Institute Learning to live in a low energy world.
- PeakOil.com US site and forum to educate and promote awareness of global hydrocarbon depletion.
- FEASTA The Foundation for the Economics of Sustainability
- Tradable Energy Quotas (TEQs) This website describes an effective and fair response both to climate change and oil/gas depletion
- Aleklett's Energy Mix Global Energy Systems, Peak Oil, etc
Other Blogs
User login
Personnel
Editors
Contributors
Peak Oil Primers
Archives
- December 2008
- November 2008
- October 2008
- September 2008
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- August 2007
- July 2007
- June 2007
- May 2007
- April 2007
- March 2007
- February 2007
- January 2007
- December 2006
- November 2006
- October 2006
- September 2006
- August 2006
- July 2006
- June 2006
- May 2006
- April 2006
- March 2006
Vital Trivia
License
This work is licensed under a Creative Commons Attribution-Share Alike 3.0 United States License.




GAIA Host Collective
The more recent mistakes have been small compared to that past mistake.
The challenge we face now is two-fold. We don't have the infrastructure (pipelines, LNG, storage) to be a major importer and the market doesn't have a several billion cubic meters to spare at reasonable prices. The infrastructure will be there within a few years, there are new or upgraded pipelines from Belgium, Norway and Netherlands and LNG at Milford Haven all due by 2008 with several 10s of billion cubic meter capacity. There still looks to be a long term storage shortage though. Whether the market will supply enough gas to maximise this new infrastructure is far more uncertain though.
You are actually (also) refering to the Bacton-Balgzand pipeline http://www.bblcompany.com/
As a resident of Den Helder, NL, the place where they want the pipeline to penetrate the dunes is 7 miles south from where I live.
from the above site: "The section of the onshore pipeline that crosses the dunes of Noord-Holland will require special attention. The 'horizontal drilling method' will be used for that purpose. This method makes it possible to lay the pipeline under the dunes without damaging the landscape. In September and October 2005 the execution of the drilling started. As the drilling got stuck, the drilling will have to be done once again."
Point is that 2 tries to drill through the dunes failed. Presumably because they struck some WWII German-build bunkers. At present the factual site looks messy; will see if I can get you some pictures of the site in the weekend.
They were not allowed to do the drilling in winter, as that is when the dunes are most vulnerable. They will resume work this spring.
Due to the above the entire project is delayed, with, I think, obvious consequences for the UK gas situation.
Please note the irony that Hitler is still succesfull at harming the British.
In addition a project to prolong the economical life of Statfjord includes a new pipeline link (Tampen Link) to be connected to the UK system. This development could add 4 Bcm/a for the UK market by fall 2007.
As for the cotractual year 2005 (now) STATOIL has a contract of 5 Bcm/a with Centrica, this in addition to 3-4 Bcm/a from NCS delivered through the Frigg system and landed in St. Fergus.
All of this could add a total of 25-30 Bcm/a from Norway by 2009, or 25-30 % of present UK nat gas consumption.
Further as I know there is under construction a new pipeline from Russia (crossing the Baltic Sea) that could be operational by 2010, and has the potential according to the owners to add up to 30 Bcm/a to the European and UK market.
The present tightness in the UK market is mostly due to the fire at one of the Rough installations, making it inoperable till May, that presently acts as the main storage facility for the UK market.
By browsing the historical data from DTI (Department of Trade and Industry)I found that actually UK have had sufficient flexibility in its nat gas supplies system.
Given the present situation, it would take a lengthy cold snap to completly empty the operable storage facilities. After all we are heading for spring and (hopefully) warmer weather.